2000
2000
Woodlands Industrial Park
As the company required more land for fabrication works, machineries, storage of materials and a growing team, there came a decision to move to a bigger premise.
![Map-frame](https://hoehoe.com.sg/wp-content/uploads/2021/05/Map-frame.png)
![Hoe Hoe 1999a](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-1999a.jpg)
HHE decided that it was about time to stop the reliance on renting yards when the workshop ran out of space for fabrication of bigger structures. At the end of 1999, HHE moved to the Woodlands Industrial Park where it is still located today.
2009
2009
Changi NEWater Plant
Successful completion of the steel structures and pipe support works before the expected date of completion. The steelworks support wasn’t simple but our team put on their best effort to finish the works well within a very tight schedule, which made us proud.
![Hoe Hoe 2009b](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2009b.png)
The Changi NEWater Plant comprises of two sections. The main process facilities of the Changi NEWater Plant were built on the roof-top of the Changi Water Reclamation Plant while the storage tanks were built on land. This innovative “plant-on-plant” design was conceptualised by PUB to help to save land costs.
![Hoe Hoe 2009](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2009.jpg)
![Hoe Hoe 2009a](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2009a.png)
SMRT CONTRACTS 855 & 906
Structural Steelworks For Singapore’s SMRT
2010
![SMRT Logo](https://hoehoe.com.sg/wp-content/uploads/2021/05/SMRT-Logo.png)
C855 Circle Line – Steelworks of 4 SMRT Stations
HOLLAND, BUONA VISTA, ONE NORTH & KENT RIDGE SMRT STATIONS
Completion of permanent structural steelworks of Holland, Buona Vista, One North & Kent Ridge (formerly known as NUH) SMRT Stations under Contract 855.
2011
2011
Bayfront Station C906
SMRT Contract 906 Bayfront Station, Downtown Line Stage 1. King Post & Plunge-in Columns, steel structures and metal works fabrication and installation were successfully completed by 2011. This station would serve the area where the integrated resort of Marina Bay Sands and Gardens by the Bay are located.
![Hoe Hoe 2011 Bayfront SMRT](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2011-Bayfront-SMRT.jpg)
![Hoe Hoe 2011 Bayfront SMRT](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2011-Bayfront-SMRT.jpg)
2013
Changi Aircraft Hangar
Successful Completion of ‘Design & Build’ Narrow Body 2 Bay Aircraft Hangar.
Aircraft Hangar
Successful Completion of ‘Design & Build’ Narrow Body 2 Bay Aircraft Hangar comprising of erection of Aircraft Hangar with 2 docks planning offices at Changi. The fabrication and installation works were successfully completed within 5 months.
![Hoe Hoe 2013](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2013.png)
![Hoe Hoe 2013](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2013.png)
![Before Image Label](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2013-before.jpg)
![After Image Label](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2013-after.jpg)
Jurong Island Pipeline Service Corridor
Fabrication and erection of the Pipeline Service Corridor.
Pipeline Service Corridor
The fabrication and erection of Pipeline Service Corridor – Pipe Racks and Bridges at Tembusu Road, Jurong Island was successfully carried out. The service corridor delivers utilities to leading global petroleum, petrochemical and specialty chemical companies across Jurong Island.
![Hoe Hoe 2013a](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2013a.png)
![Hoe Hoe 2013b](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2013b.png)
Pipeline Service Corridor
The fabrication and erection of Pipeline Service Corridor – Pipe Racks and Bridges at Tembusu Road, Jurong Island was successfully carried out. The service corridor delivers utilities to leading global petroleum, petrochemical and specialty chemical companies across Jurong Island.
![Hoe Hoe 2013b](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2013b.png)
2018
![logo-fraserstower](https://hoehoe.com.sg/wp-content/uploads/2021/05/logo-fraserstower.png)
Frasers Tower
Successful completion of the Architecturally Exposed Structural Steelworks (AESS) at Frasers Tower in the Central Business District of Singapore.
![Hoe Hoe 2018](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2018.png)
![Hoe Hoe 2018a](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-2018a.jpg)
Due to the busy streets full of cars and people walking during the day and early evening, some of the structures could only be transported by escorted trailers later at night and complex installation works could only be carried out within a mere few hours in the evening.
NATIONAL DAY PARADE 2019
Supporting Singapore National Day Parade (NDP)
2019
![Hoe Hoe NDP Flaga](https://hoehoe.com.sg/wp-content/uploads/2021/05/Hoe-Hoe-NDP-Flaga.png)
National Day Parade 2019 Sponsorship
Supplying platforms for military tanks and vehicles.
Supported Singapore National Day Parade (NDP) 2019 with sponsorship of the platforms for military tanks and vehicles at 4 different parade locations. The NDP 2019 was special as it was a commemoration of Singapore’s Bicentennial.
National Day Parade 2019
Appreciation Function